Standard |
The student is introduced to the pipes, fittings, valves, hangers and
joining methods used in commercial plumbing and pipe fitting. Topics include: pipes,
fittings, and valves; hangers and supports; and joining techniques.
|
Competency Areas |
Hours
|
|
|
Pipes, Fittings, and Valves |
Class |
1 |
|
Hangers and Supports |
D. Lab |
2 |
|
Joining Techniques |
P. Lab/O.B.I. |
(3) |
|
|
Credit |
2 |
Note to CPS: Please see highlighted items.
|
Prerequisite/Corequisite: |
PLB 120 |
Guide Material Is Unavailable
Course Guide |
|
Competency |
After completing this
section, the student will: |
Hours |
||
|
Class |
D.Lab |
P.Lab/ O.B.I. |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Suggested Resources |
Unavailable